A+ A A-

ABOUT ZESA HOLDINGS (PVT) lTD

VISION
Our vision is to be among the leading and most dynamic electricity, engineering and telecommunications services providers

MISSION STATEMENT
We are committed to the provision of quality electricity, engineering and telecommunication services to customers throughout Zimbabwe and the region, at competitive prices whilst creating value for our stakeholders

This means that the Group is committed to meet or exceed the expectations of the customers and stakeholders by:

    •     Delivering prompt and efficient customer services
    •     Developing and managing resources vital to our success and pursuit of excellence in providing the services deserving to our customers and community.
    •     Developing our employees and providing them with incentives
    •     Providing affordable, safe, and reliable electricity, engineering and telecommunication services.
    •     Undertaking our business in an environmentally responsible manner and.
    •     Being the preferred employer in the country and the region

ETHICS
Our ethics include:

    •     Honesty
    •     Integrity
    •     Transparency
    •     Accountability

VALUES
In order to attain our vision and mission our core values are:

    •     Team work
    •     Innovation
    •     Conducive work environment
    •     Sustained improvement of life for employees
    •     Sustainable creation of shareholder value
    •     Social responsibility
    •     Continuous skills development
    •     Productivity
    •     Customer delight
    •     Professionalism
    •     Commitment to work
    •     Enthusiasm
More in this category: Our Services »

Load Shedding Status

    Minimal
    Light

 
  Moderate
    Heavy
    Severe

Power Generation Stats

Gen Station

27 September 2017

Energy
(Megawatts)
Hwange

506 MW

Kariba 716 MW
Harare

   0 MW

Munyati 16 MW
Bulawayo 

12 MW

Imports   0-450 MW
Total

 

1580 MW

Comparative Average Tariffs

  • Global Tariffs
Click here
  • Regional Tariffs

US14c kWh

  • Zimbabwe Tarriffs

US9.83c kWh

Contact Details

+263 4 773302/04-10,
+263 4 773314/16/18/19/24/28-31/34,
+263 4 774491/96/98-9

Fax:+263 4 774542/3
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Address:     Electricity Centre
                       25 Samora Machel Ave
                       Harare

ZESA HOLDINGS Private Limited © 2013

Developed By Total IT Solutions Zimbabwe

Close

Load Shedding Status

    Minimal
    Light

 
  Moderate
    Heavy
    Severe

Power Generation Stats

Gen Station

27 September 2017

Energy
(Megawatts)
Hwange

506 MW

Kariba 716 MW
Harare

   0 MW

Munyati 16 MW
Bulawayo 

12 MW

Imports   0-450 MW
Total

 

1580 MW

Close

Major Power Faults

 

 

 

ZESA HOLDINGS (PVT) LTD

 

 

 

POWER SUPPLY UPDATE

 

ZESA Holdings would like to advise its valued customers countrywide of the reduction in generation at Kariba Power Station due to depleted dam water levels, commencing on Tuesday 1st September 2015 at 1800hrs, in compliance with the Zambezi River Authority (ZRA) requirement to scale down on water consumption.

 

Generation will consequently be reduced from the normal 750MW to 475MW until dam levels have risen to the requisite levels.

 

During this period, the Zimbabwe Power Company (ZPC) will take full advantage of the reduction of Units in service at Kariba to undertake the annual statutory maintenance, scheduled to be conducted between the 1st of September 2015 and 28 January 2016.

 

Whilst generation at thermal power stations is not affected by hydrological issues, Units at Hwange Power Station will also undergo statutory maintenance which will be completed by 7 October 2015, to ensure greater safety and reliability going forward.

 

The power utility further advises customers that the planned annual maintenance of Hwange and the reduction in water levels at Kariba dam will lead to changes being effected to the previously publicized load shedding schedule.

 

Consumers will experience suppressed power supplies until generation is brought back to normal levels.

 

Although the effects of load shedding will be minimized with possible power imports where available, ZESA Holdings urges consumers to use the available power very sparingly to minimize the extent and duration of load shedding.

 

ZESA Holdings sincerely apologises for the unavoidable inconvenience caused.