A+ A A-

ABOUT ZESA HOLDINGS (PVT) lTD

VISION
Our vision is to be among the leading and most dynamic electricity, engineering and telecommunications services providers

MISSION STATEMENT
We are committed to the provision of quality electricity, engineering and telecommunication services to customers throughout Zimbabwe and the region, at competitive prices whilst creating value for our stakeholders

This means that the Group is committed to meet or exceed the expectations of the customers and stakeholders by:

    •     Delivering prompt and efficient customer services
    •     Developing and managing resources vital to our success and pursuit of excellence in providing the services deserving to our customers and community.
    •     Developing our employees and providing them with incentives
    •     Providing affordable, safe, and reliable electricity, engineering and telecommunication services.
    •     Undertaking our business in an environmentally responsible manner and.
    •     Being the preferred employer in the country and the region

ETHICS
Our ethics include:

    •     Honesty
    •     Integrity
    •     Transparency
    •     Accountability

VALUES
In order to attain our vision and mission our core values are:

    •     Team work
    •     Innovation
    •     Conducive work environment
    •     Sustained improvement of life for employees
    •     Sustainable creation of shareholder value
    •     Social responsibility
    •     Continuous skills development
    •     Productivity
    •     Customer delight
    •     Professionalism
    •     Commitment to work
    •     Enthusiasm
More in this category: Our Services »

Load Shedding Status

Minimal
Light

 
Moderate
Heavy
  Severe

Power Generation Stats

Gen Station

11 October   2019

Energy
(Megawatts)
Hwange

         352 MW

Kariba

  150-300 MW

Harare

          15 MW

Munyati           18 MW 
Bulawayo 

         17 MW

Imports

     0-400 MW      

Total

 

627-1226 MW

Comparative Average Tariffs

  • Global Tariffs
Click here
  • Regional Tariffs

US14c kWh

  • Zimbabwe Tarriffs

US9.83c kWh

Contact Details

+263 4 773302/04-10,
+263 4 773314/16/18/19/24/28-31/34,
+263 4 774491/96/98-9

Fax:+263 4 774542/3
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Address:     Electricity Centre
                       25 Samora Machel Ave
                       Harare

ZESA HOLDINGS Private Limited © 2013

Developed By Total IT Solutions Zimbabwe

Close

Load Shedding Status

Minimal
Light

 
Moderate
Heavy
  Severe

Power Generation Stats

Gen Station

11 October   2019

Energy
(Megawatts)
Hwange

         352 MW

Kariba

  150-300 MW

Harare

          15 MW

Munyati           18 MW 
Bulawayo 

         17 MW

Imports

     0-400 MW      

Total

 

627-1226 MW

Close

Major Power Faults

The Zimbabwe Electricity Transmission & Distribution Company (ZETDC) is experiencing increased power shortfalls i.e. demand and supply mismatch, due to low water levels at Kariba Power Station, generation constraints at Hwange Power Station and limited imports. The power shortfall is being managed through load shedding in order to balance the power supply available and the demand.
Every effort is being directed at improving the generation capacity to ensure that supply disruptions are kept at minimum levels. In order to assist in reducing the power demand, customers are encouraged to use the limited available power sparingly, by switching off all non-essential loads. Domestic geysers, swimming pool pumps, Jacuzzis and other related equipment should be switched off at peak times for more areas to have power.
Please be advised that ordinarily, load shedding will be within the morning and evening peak periods of 5am to 10am and 5pm to 10pm respectively. However, the durations may be longer in the event of increased power shortfall to avoid the collapse of the National Electric grid.


The load shedding cycles will be in two stages as follows;
Stage 1; the first group of customers as listed on the schedule will be switched off as the power shortfall will be within planned limits.
Stage 2; Please be advised that the power supply situation is dynamic, in the event that the power shortfall increases beyond the planned limits, load shedding will move into stage 2. These are additional areas that will be switched off as per schedule when the shortfall is higher for the particular time.
Customers will be informed as soon as the situation requires stage two implementation.
Large power users are being requested to reduce their power demand during the morning and evening peak periods of 5am to 10am and 5pm to 10pm respectively.

see 2019 LOAD SHEDDING PROGRAMMES